Pavement?An Integral Part of the Terminal as a Container Handling System
A modern container terminal requires extensive areas of paving for stacking and moving containers, the provision of which often proves to be one of the most expensive single items, in...

Berth 5-6 Pavement Performance: Port of Oaklan
In 1978 the Port of Oakland commenced a project to demolish the old Berth 5, 6 & 7 break bulk sheds, portions of the wharves, and the warehouses behind, and to construct container...

U.S. Navy's First Double Deck Pier
The present single level concept of pier construction limits the pier-side service to the fleet. With the ever increasing requirements for utilities to the ships, and maintenance and training...

Construction Approaches to the Navy's Floating Pier Concept
The subject of this paper is a floating pier which is currently under evaluation as a more cost-effective solution for berthing Navy ships. This new approach to pier design was sponsored...

Gabon Mineral Port Planning
There has been increasing interest in the use of topping-off and top-loading vessel transport systems to ease the burden of expenditures for deepening harbors to fully load large vessels....

The Application of Computer Simulation in the Design of Marine Terminals and the Scheduling of Ship Traffic
This paper describes a software package which simulates the operations of marine terminals. The computer programs were designed to assess the effectiveness of the available design alternatives...

Tacoma Sea-Land Terminal: A Project Management Challenge
The Port of Tacoma completed a new two berth container terminal and intermodal yard for Sea-Land in May 1985 in only 26 months after signing a binding agreement. The project, which also...

Conversion of Keppel Wharves Conventional Berths 42 & 43 to Container Berths C13 and C14, Singapore
With further growth of container traffic expected in the 80's the need for additional facilities was apparent. Following an evaluation of available alternative sites, it was...

Carnation Terminal, Oakland?Preliminary Design
The Preliminary Design process is examined as it was applied to design of wharves for a new container terminal in the Port of Oakland, California. The process includes active interdisciplinary...

Fourth Generation Container Crane Characteristics
The specification of container crane characteristics requires the examination and identification of numerous ship and terminal operating parameters and trends to ensure that the specified...

Trends in Containerships and Their Impact on Terminal Design
A revolution in ocean shipping operations, affecting both landside equipment and cargo handling methods, is underway. In today's container shipping industry, maximum efficiency...

Terminal Development as Affected by New Generation Ships
Howland Hook Marine Terminal, New York, serves to illustrate how an existing terminal, built to the older standards, can be adapted to accommodate these larger ships that not only stretch...

Design Concepts for Floating Breakwaters
This paper describes a fundamental approach to the design of a floating breakwater based on the concepts of dynamic analysis of floating bodies. The process results in a relatively simple...

Port Design and Ship Characteristics
The close relationship between ship characteristics and terminal design is recognized and should be considered as integral part of the total transporation. Ship characteristics to be considered...

Container Crane Transfer Methods
Four schemes are presented for transferring container cranes around a corner: 1) transfer of crane on curved rail, 2) recessed short-radius shuttle, 3) recessed turntable and, 4) at-grade...

Structural Design of Container Cranes
The shipping industry uses container cranes to move cargo containers on and off ships. Container cranes have characteristics common to all crane structures, but many characteristics are...

Dual Hoist Container Cranes for Virginia Port Authority
The dual hoist container crane has proven to be substantially more productive than conventional container cranes. Virginia Port Authority has purchased three new dual hoist cranes with...

Innovative Bulkhead Design: Third Port Project?St. Croix, U.S. Virgin Islands
This paper describes an innovative design making use of a 'master pile' bulkhead to support the waterside rail for travelling container cranes as well as to retain...

Container Wharves Supported on All Vertical Piles Embedded in Rock-Fill Dikes
In recent years, several container wharves have been planned and/or constructed which feature the construction of the wharf over a sloping rock-fill dike. The wharves utilize all vertical...

Lessons Learned from the Certification of Graving Docks, Marine Railways, Vertical Lifts and Shipbuilding Ways
Because of the hazards which exist during the ship docking, undocking, launching and while the ship is being built or repaired, the Navy has determined a requirement exists for system...

 

 

 

 

Return to search